| Project Numbers: |
LADOTD: 742-55-0002; FAP: STP 3008 (005) |
| System: |
Collector |
| Location: |
Terrebonne Parish |
| Length: |
.80 miles |
| Funding Source: |
STP<200K |
| Lanes: |
4 |
|
Visioned to be a 4-lane, undivided road with subsurface drainage
Environmental Assessment complete with a finding of “No Significant Impact”
Designs Complete
Currently carries about 17,000 vehicles per day with as much as 10% truck traffic
Will build road to 6.9 ft. elevation with a 25-year design-storm drainage system
Expected to be constructed sometime during mid 2010 to 2011
|