Transportation Improvement Program
The Transportation Improvement Program (TIP) is an intermediate-range planning document that reflects the transportation expenditures that are planned to be spent over the next four years. Project details are provided, such as project description, cost, funding source, and funding year. The TIP contains information on planning studies, road improvements, and transit. It is updated every four years.
2023-2026 HTMPO TIP
- FY 2023-2026 TIP version 1.0
- FY 2023-2026 TIP version 1.1
- FY 2023-2026 TIP Version 2.0
- FY 2023-2026 TIP Version 2.1
- FY 2023-2026 TIP Version 3.1
- FY 2023-2026 TIP Version 4.1
- FY 2023-2026 TIP Version 4.2
- FY 2023-2026 TIP Version 5.0
- FY 2023-2026 TIP Version 5.1
- FY 2023-2026 TIP Version 5.2
- FY 2023-2026 TIP Version 6.0
- FY 2023-2026 TIP Version 7.0
- FY 2023-2026 TIP Version 7.1
- FY 2023-2026 TIP Version 7.2
- FY 2023-2026 TIP Version 7.3
- FY 2023-2026 TIP Version 7.4
- FY 2023-2026 TIP Version 7.5
Record of Adoption and Changes
- September 22, 2022: TIP adopted by HTMPO Policy Committee
- October 4, 2022: Administrative modification to address comments on the draft by the FHWA.
- January 26, 2023: Amended by the adjust the scope of Pedestrian Improvements: LA 1, Audubon Ave. Bowie Roadto include an additional intersection.
- February 6, 2023: Administrative modification to project H.013453 BAYOU BLUE (LA 316) SIDEWALKS increasing the engineering phase from to $173,280.
- May 4, 2023: Amended to include the project H.013116 LA 20 Widen: LA 307 – S. Vacherie: Environmental Phase at $225K HSIPPEN at 100% in FFY 2023; Construction Phase of $17.1M in HSIPPEN at 90/10% in FFY 2023.
- May 12, 2023: Administrative modification to make technical corrections in the document and H.013116 LA 20 WIDEN: LA 307 – S. VACHERIE change Environmental Phase from $225k in HSIPPEN at 100% in FFY 2023 to $1M in HSIPPEN at 100% in FFY 2023.
- July 27, 2023: Administrative modification to H.015654 CITY OF THIBODAUX PED IMPROVEMENTS: LA 1, BOWIE ROAD, AUDUBON AVENUE change construction phase from FFY 23 to FFY 26. Administrative modification to H.013714 VALHI BOULEVARD SHARED-USE PATH (HOUMA) to change construction phase from $350k in HSIPPEN at 100% and $63,492.40 in STP50-200k at 80/20 in FFY 2024 to $350k in HSIPPEN at 100% and $63,492.40 in STP50-200k at 80/20 in FFY 2025. Amendment to H.014802 LA316 & LA 24: MILL,OVRLY,GRADE RAISING,HFST to add construction phase $3.58M in STGEN, $1.535M in HSIPPEN at 100% and $600k in PROTECT at 80/20 in FFY 2024. Amendment to H.014849 US 90: 0.9 MI W LA 311 – MCMAHON CANAL to add construction phase $17.5M in NHPP at 80/20 and $xx in DEMO in FFY 2023. Administrative Modification to H.014849 US 90: 0.9 MI W LA 311 – MCMAHON CANAL to include $3,400,000 in DEMO in FFY 2023.
- August 2, 2023: Administrative Modification: Lafourche Council on Aging recieved FTA Enhanced Mobility for Seniors and Individuals with Disabilities funding to purchase (2) 12 passenger vehicles totaling $280,852.00 (85% federal share of $238,724.20; 13.8% local match of $38,757.58; 1.2% Parish Transportation funds of $3,370.22).
- September 15, 2023: Administrative modification to H.013269 AUDUBON AVE OVLY: LA 1 TO TERREBONNE P/L to increase the Construction phase from $469,380 in STP50-200k at 80/20 in FFY 2024 to $1.2M in STP50-200k at 80/20 in FFY 2024. Administrative modfication to H.013340 VALHI BLVD, MULTI-USE TRAIL, PHASE 1 to decrease construction phase from $973,020 in STP50-200k at 80/20 in FFY 2024 to $890k in STP50-200k at 80/20 in FFY 2024.
- October 26, 2023: Amended to remove the following projects from HTMPO ‘s 2023-2026 TIP: H.013402 LA1 & LA308 PED & MULTIUSE PATH (LOCKPORT), H.013404 LA 1 SIDEWALKS (CUT-OFF), and H.013490 CENTRAL LAFOURCHE MULTI-USE PATH PH 1A. Amendment to H.013714 VALHI BLVD SHARED-USE PATH (HOUMA) to add Engineering phase $139k in HSIPPEN at 100% in FFY 2024. Amendment to include H.015662 VALENTINE PONTOON BRIDGE (HBI) add Environmental phase $62.5k in LOCAL in FFY 2024; add Engineering phase $693.5 in LOCAL in FFY 2024; add Construction phase $3.3M in EARMARK at 80/20, $1.2M in FBROFF at 80/20 and $1.6M in LOCAL in FFY 2025. Amended H.972506.1 (HTMPO TRANS PLAN UPDATE SFYS 2024-2025) to add $275,000 STP50-200K funding at 80/20 in FFY 2024.
- November 16, 2023: Administrative modification to H.015662 VALENTINE PONTOON BRIDGE (HBI) to move Environmental phase $62.5k in LOCAL and Engineering phase $693.5 in LOCAL from FFY 2024 to FFY 2023.
- December 15, 2023: Administrative Modification to Canal Boulevard Overlay: Jackson Street to LA 1 to move $145,560 STP50-200k from FFY 2023 to FFY 2024.
- January 25, 2024: Amended H.013403 LA 20 & LA 304 SIDEWALK IMP (CHACKBAY): Remove Engineering phase $40k in STP50-<200k at 80/20 in FFY 2023 remove Construction phase $262,710 in STP50-<200k at 80/20 in FFY 2024.
- April 25, 2024: Amended H.012859 CIVIC CENTER BLVD @ VALHI BLVD to add Engineering phase $375,757 in STP>200k at 80/20 in FFY 2024.
- May 16, 2024: Administrative Modification to H.013453 BAYOU BLUE (LA 316) SIDEWALKS moving ROW phase to FFY25; H.012859 CIVIC CENTER BLVD @ VALHI BLVD moving ROW phase to FFY25; and H.013940 LA 648 & ACADIA ROAD INTERSECTION IMPROV moving ROW phase to FFY25.
- July 2, 2024: H.013429 DOWNTOWN THIBODAUX SIDEWALKS Administrative modification to change construction phase from $1M in STP50-200k at 80/20 in FFY2024 to $1.245M in STP50-200k at 80/20 in FFY2024
- July 24, 2024: Administrative Modifications to the following:
- H.013453 BAYOU BLUE (LA 316) SIDEWALKS – Move ROW phase to FFY25.
- H.012859 CIVIC CENTER BLVD @ VALHI BLVD – Move ROW phase to FFY25.
- H.013940 LA 648 & ACADIA ROAD INTERSECTION IMPROV.- Move ROW phase to FFY25.
- H.013429 DOWNTOWN THIBODAUX SIDEWALKS – Change construction phase from $193,200 in STP50-200k at 80/20 in FFY2024 to $1M in STP50-200k at 80/20 in FFY2024.
- H.013116 LA 20 Widen: LA 307 – S. Vacherie: Administrative modification to include CE & IDC in total construction costs. Total construction costs will increase from $18,810,000 to $19,810,000 in FFY 2023.
- H.014849 US 90: 0.9 MI W LA 311 – MCMAHON CANAL (Lafourche and Terrebonne): Administrative modification to include CE & IDC in total construction costs. Total construction costs will increase from $14,100,000 to $15,510,000 in NHPP in FFY 2023; and $3,400,000 to $3,740,000 in DEMO in FFY 2023.
- H.015662 VALENTINE PONTOON BRIDGE (HBI): Administrative modification to include CE & IDC in total construction costs. Total construction costs will increase from $3,300,000 to $3,630,000 in EARMARK in FFY 2025; increase from $1,200,000.00 to $1,320,000 in FBROFF in FFY 2025; and increase from $1,600,000.00 to $1,760,000.00 in LOCAL in FFY 2025.
- H.002244 LA 56: Boudreaux Canal MB Replacement: Administrative modification to include CE & IDC in total construction costs. Total construction costs will increase from $23,703,690 to $26,074,059 in STPFLEX in FFY 2023.
- H.972506.1 (HTMPO TRANS PLAN UPDATE SFYS 2024-2025): Administrative modification to project phase description. Modify “Construction” to “Planning”.
- H.013269 AUDUBON AVE OVLY: LA 1 TO TERREBONNE P/L: Change Phase 6 (Construction) from $1.2M STP 50 – 200K at 80/20 in FFY 2024 to $1.51M STP 20-200K at 80/20 in FFY 2024.
- H.015654 CITY OF THIBODAUX PED IMPROVEMENTS: LA 1 at Bowie Road/ LA 1 at Audubon Ave.: Change Phase 5 (Design) from $20K in Local in FFY 2023 to $20K in STP 50 – 200K at 80/20 in FFY 2025. Modify name to match STIP: CITY OF THIBODAUX PED IMPROVEMENTS.