Hollywood Road Widening

Click for larger view

Click for larger view

Project Numbers: LADOTD: 742-55-0002; FAP: STP 3008 (005)
System: Collector
Location: Terrebonne Parish
Length: .80 miles
Funding Source: STP<200K
Lanes: 4

  • Visioned to be a 4-lane, undivided road with subsurface drainage
  • Environmental Assessment complete with a finding of “No Significant Impact”
  • Designs Complete
  • Currently carries about 17,000 vehicles per day with as much as 10% truck traffic
  • Will build road to 6.9 ft. elevation with a 25-year design-storm drainage system
  • Expected to be constructed sometime during mid 2010 to 2011
  • PDF Map